Re Roofing – A Step by Step Guide
by Raving Roofing
Re-roofing your house can seem overwhelming, but you’re in good hands with Raving Roofing. Let us walk you through the process:
- Free inspection and detailed written quotation provided.
- Sample tiles and brochures provided for roof tile selection.
- Installation of Safety Rail in accordance with Worksafe Victoria, working at heights above 2 metre Rule.
- Remove all the old roof tiles and ridge caps ready to take away for recycling.
- Check the roofing structure to ensure it is in good condition.
- Install sarking if requested.
- Install new roof battens.
- Lay new roof tiles, using fixing clips or nails to secure the roof tiles to the roof.
- New valley irons installed and installation of valley seal.
- Ridge Caps installed and “bedded” with mortar.
- Ridge is then “Pointed” using flexible pointing with the same colour to match the roof.
- Roof is then cleared with a blower, gutters cleared and all rubbish removed from site.
- Safety rail is then taken down and final inspection carried out.